Brownfield Solar Sites
Blog
16 November 2026
Field notes: the scrapyard that scored high but flopped at planning committeeWhy a high-scoring brownfield candidate can still die at planning committee, and what that gap means for how you read a screening dossier.
16 November 2026
Derelict land vs. brownfield land: why the difference matters for solar sitingDerelict land and brownfield land aren't the same thing in planning terms. Here's the distinction, and why it matters when screening sites for solar.
9 November 2026
Greenfield vs brownfield solar siting: how planning risk actually differsA planner's comparison of greenfield and brownfield solar siting risk: the farmland fight, the goodwill difference, and what still needs checking.
9 November 2026
Spotting contaminated ground from vegetation stress in satellite imageryHow land planners read vegetation stress patterns in multispectral satellite imagery to flag contaminated or disturbed ground worth a second look.
2 November 2026
Field notes: the landfill sailed through planning, the cornfield didn'tA planning committee waved through solar on a closed landfill the same night it buried an application on good arable land next door. Here's why.
2 November 2026
How to screen former coal ash ponds for solar developmentA land planner's guide to screening retired coal ash ponds for solar siting: closure status, cap type, and what to check before you pull records.
26 October 2026
How to tell a restored quarry from an active quarry in satellite imageryHow to read quarry benches, haul roads, lagoons and vegetation in satellite imagery to confirm whether extraction has actually stopped.
26 October 2026
Land Remediation Relief: what it means for solar site selectionA plain-language look at Land Remediation Relief and how contaminated land tax relief changes the economics of siting solar on brownfield ground.
19 October 2026
Field notes: the slag heap that turned out to be three different parcelsA field note on a single slag heap split across three parcels, three owners, and what that means for solar siting screens.
19 October 2026
Previously developed land: what it is and why solar developers careA plain explainer on previously developed land (PDL), how it differs from greenfield, and why it carries planning weight for solar siting.
14 October 2026
How to spot a former gasworks site in satellite imageryCircular holder scars, cinder fill and stunted vegetation: the tells that mark old gasworks ground in satellite imagery, and why solar planners chase them.
14 October 2026
What is a planning presumption in favour of brownfield development?A plain explainer on brownfield presumption planning policy and why it matters when you're screening degraded land for a solar siting shortlist.
13 October 2026
How to read a council brownfield land register for solar site leadsA practical guide to reading local authority brownfield registers for solar leads, and where they stop short of showing landfill and quarry land.
13 October 2026
Phase I ESA vs. satellite screening: what still needs the paperworkWhat a Phase I ESA covers, how it differs from satellite screening, and when solar land teams still need one after the screen.
7 October 2026
Closed landfill vs. active landfill: which one actually pencils for solarWhat separates a closed cell ready for a solar lease from an active landfill that isn't, and why cap condition matters more than the fence line.
7 October 2026
How to check landfill cap integrity before a solar leaseWhat to pull from the post-closure file and check on-site before leasing a capped landfill for a solar array.
7 October 2026
Spoil heap vs tailings pile: which sites take solarSpoil heaps and tailings piles aren't the same for solar siting. What separates them, and which one clears permitting faster.
7 October 2026
What counts as a brownfield under local zoning codesA land planner's guide to how brownfield definitions shift between federal law and local zoning codes, and what that means for siting renewables.